Boston Transportation Planning Review (BTPR) is a transportation planning program for metropolitan Boston, United States which was responsible for analyzing and re-designing the entire area-wide transit and highway system in the 1970s. The major contractors involved were Alan M. Voorhees Company (Virginia), project manager; Skidmore, Owings and Merrill (New York), architect; ESL Incorporated (California), air quality and acoustics. The program had close guidance from the national Transportation Research Board (TRB), a division of the U.S. National Academy of Sciences1. The first director of the program reporting to the Governor was Alan Altshuler; the project manager was Walter Hansen.
Comprehensive re-evaluation of areawide transportation plans was a major theme in the last quarter of the twentieth century for large U.S. cities. The U.S. Department of Transportation has said "the prototype for these reevaluations was the Boston Transportation Planning Review"[1]. Scope of the BTPR studies included evaluation and upgrading of all four MBTA mass transit rail lines and examination of every major highway and arterial project in the region.
Contents |
Major elements
The following exemplify some of the principal study elements of the Boston Transportation Planning Review:
- Conceptual design of the Orange Line, mass transit rail service to the south and west.
- Expansion plans for the Red Line Braintree and Northwest extensions.
- Moratorium on expressway construction inside of Route 128 for the decade.
- First concept of depressing the Central Artery23, leading to the Big Dig4.
- Upgrading of Route 1A from Boston to Salem.
Technologies applied
The following major technologies were utilized in the BTPR:
- Critical path work element diagrams to assist project management (Voorhees)
- Citywide traffic flow analysis including intersection level of service (Voorhees)
- Urban design of all physical structures and highway geometrics including neighborhood visual impacts (Skidmore, Owings and Merrill)
- Hydrology Impact Analysis to surface waters and groundwater affected by transit and roadway construction.
- Air quality and noise contour maps for all transportation alternatives5 (ESL)
- Wildlife and vegetation impact analysis for all alternatives6.
References
- ^ Toby Pearlstein, Transportation planning in the Boston metropolitan area, 1930-1982, Chicago, Ill. : CPL Bibliographies, 1983.53 p. CPL bibliography ; no. 128
- ^ Boston Transportation Planning Review with Alan M. Voorhees & Assoc., Central Artery, Prepared for the Commonwealth of Massachusetts, EOTC, DPW, and MBTA, November 1972
- ^ Boston Redevelopment Authority, Central Artery Depression: A Preliminary Feasibility Study, Final Draft, 1975
- ^ Alan Altshuler and David Luberoff, Mega-Projects: The Changing Politics of Urban Public Investment (Washington, DC: Brookings Institution, 2003). ISBN 0-8157-0129-2
- ^ C.Michael Hogan, Richard Venti, Leda Patmore and Harry Seidman, Air quality and community noise contour maps for metropolitan Boston, ESL Inc. prepared for BTPR, (1973)
- ^ Gackenheimer, R., Transportation Planning as Response to Controversey: The Boston Case, Cambridge: MIT Press (1976)
See also
External links
Wikipedia content modification information:
- This page was last modified on 27 November 2008, at 19:20.
Wikipedia Authorship and Review
Wikipedia content provided here is not reviewed directly by PediaView.com. Wikipedia content is authored by an open community of volunteers and is not produced by or in any way affiliated with PediaView.com.
Wikipedia Usage Guidelines
This article is licensed under the GNU Free Documentation License. It uses material from the Wikipedia article on "Boston Transportation Planning Review".
The URL for this specific entry is:
All Wikipedia text is available under the terms of the GNU Free Documentation License. (See Copyrights for details). Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc.
